







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Dvele Kitchen Remodeling: The Long Beach Owner’s Guide
Kitchen remodeling for a Dvele home in Long Beach typically runs $14,000 – $45,000, and the price depends on layout, cabinet line and countertop material. We give you that number in writing before any work starts, and it’s the same number on the invoice. Because Dvele homes are precision-built with panelized walls and factory-set tolerances, kitchen work here isn’t the same as a 1950s bungalow remodel. Owners usually find out something is off when a cabinet door stops closing flush, a countertop seam lifts near the sink, or a backsplash tile cracks along a straight line that turns out to be a wall panel joint. That last one is the tell. It means the substrate behind the tile has moved, and no amount of new caulk will fix it.
Which Dvele Models This Applies To

Dvele builds a range of modular and panelized homes, and the kitchen specs shift between series. Older Dvele plans often used standard 24-inch-deep base cabinets with a 34.5-inch counter height, while some newer layouts run deeper runs and integrated appliance towers. Before we order a single cabinet, we measure what’s actually in your kitchen: cabinet depth, counter height, the position of plumbing rough-ins, and the wall panel seams. That last measurement matters most. Dvele wall panels are engineered to tight tolerances, and a cabinet run that ignores the seam line will telegraph movement into your countertop within a season.
If you’re matching existing Dvele cabinetry, check the label inside a cabinet door or on the back of a drawer box. It usually lists the series and the door style. Bring that to your estimate and we can match it against KraftMaid and Wellborn lines, which are what we install most often in Long Beach. On the countertop side, Cambria, Silestone and Caesarstone all cut to fit a Dvele kitchen, and each carries its own manufacturer warranty alongside ours.
On OEM versus aftermarket: Dvele’s factory cabinet and trim components are built to their spec, and matching them exactly can mean a long lead time. For most Long Beach remodels, a quality cabinet line built to the same dimensions gets you a better fit, a faster timeline, and a real warranty. We’re an independent remodeling company, not affiliated with Dvele, so we’ll tell you plainly when OEM makes sense and when it doesn’t.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Dvele Kitchen Remodeling Is Failing
Here’s what Long Beach owners actually report, and what’s usually behind it.
- Cabinet doors that won’t stay aligned. The hinge plate has loosened from the panel, or the cabinet box has shifted off the wall panel seam. On a Dvele wall, a box that wasn’t shimmed to the seam will drift within a year.
- A countertop seam lifting near the sink or range. Moisture has gotten under the seam and the substrate has swelled. Long Beach’s marine air and winter rain push this along faster than inland climates do.
- Backsplash tile cracking along a straight line. That line is a wall panel joint, and the tile was set without a movement joint over it. The panel flexes, the tile doesn’t.
- Soft or spongy floor near the sink or dishwasher. Water has reached the subfloor. In a panelized Dvele floor system, that means the panel edge is wicking, and it spreads.
- Drawers that stick or bind in humid weather. The drawer box has absorbed moisture, or the slides were sized for a dry climate. Coastal Long Beach humidity makes this a recurring issue in kitchens that don’t get cross-ventilation.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a Long Beach kitchen remodel, plan on these installed ranges. Every one of them is a written price, not a range that grows after demo.
| Work | Installed range |
|---|---|
| Full kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What drives the range: cabinet line (a painted KraftMaid run costs more than a stock Wellborn box), countertop material (Cambria quartz sits higher than a Silestone slab), and whether we’re cutting into a Dvele wall panel to move plumbing. The number includes labor, materials and cleanup. It includes the 365-Day Done Right Promise: if something we installed fails inside a year, we come back and fix it at no charge, and that’s written on the contract. We’re licensed and insured, and every technician who walks into your Long Beach home is background-checked and arrives in uniform.
DIY or Call Us?
Some of this is safe to check yourself. Open a cabinet door and look at the hinge plate. Run a level along the countertop seam. Press the floor near the sink with your heel. Those tell you a lot.
What we’d steer you away from: pulling a cabinet box off a Dvele wall panel without knowing how the panel is anchored, or resetting a countertop seam yourself. Get the panel wrong and you’re into structural repair, not a remodel. Same with anything behind the wall: electrical for a new range circuit, gas lines for a cooktop. Those are licensed-trade work, and it’s where DIY kitchens go from a weekend project to a five-figure fix. When you’re ready for a number, call (833) 510-6967 for a free estimate.
FAQs

Cabinetry and countertops typically hold up 15 to 25 years, but a Dvele kitchen on the coast often needs attention sooner at the wet zones: the sink seam and the backsplash over panel joints. Long Beach humidity and salt air work on those faster than inland climates. Call (833) 510-6967 for an exact quote on what needs replacing and what doesn’t. Estimates are free.
Sometimes, yes. A loose hinge plate, a re-caulked seam or a single cracked tile can often be repaired without touching the cabinets. A lifted countertop seam over a swelled substrate usually can’t be repaired reliably, and we’ll tell you that up front rather than sell you a patch. Call (833) 510-6967 and we’ll give you the honest call.
A cabinet-only swap runs 3 to 5 days. A full kitchen remodel with countertops and backsplash runs 3 to 6 weeks depending on material lead times. We set a real arrival window on day one and stick to it. Call (833) 510-6967 for a schedule and a written price.
We measure your existing kitchen and match the cabinet series from the label inside the door, then source from recognized lines like KraftMaid and Wellborn. We don’t carry parts on a truck or stock them locally, so lead time is real and we’ll quote it. Call (833) 510-6967 for a free estimate and a written lead-time commitment.
Written by the team at Penhallow Remodeling Long Beach, serving Long Beach and nearby areas.












